Installation and Commissioning
The heavy-duty load banks must be properly installed and commissioned before using them for testing. The installation and commissioning of a load bank involves the following:
- The position of a load bank at its final position after unpacking it.
- The fixing of load bank using nut/bolts onto its platform
- Placement of earthing
- The wiring of load bank input terminals with the unit under test.
- The wiring of bank Auxiliary terminals with the raw power outlet of the customer.
- The wiring of communication bus between Load Bank, Central console and User Terminal if any.
- The mounting of Central Console at its desired location.
- Conduct Auxiliary supply check activity. This activity involves testing the continuity of Auxiliary supply connections.